Arkas engineers, working in conjunction with Gallagher Contractors Limited on the Tilbury Dock’s project designed, supplied, delivered and installed 24 double skinned galvanised steel sectional doors.

2 Framex steel flush fire escape doors and frames were also supplied and installed.

These were fitted with panic exit hardware, and were powder coated to clients specifications.

This extensive project took a total of 5 weeks from acceptance of quotes to final project completion, and complied with British Standard safety guidelines including BS EN 12604 and BS EN 1245.

Arkas engineers work efficiently alongside various other contractors to deliver industrial door projects to the highest standard within a demanding time limit.